%30
The first payment is 30% of the apartment cost.
%70
Construction supervision and monthly payments of 10% of the value of the apartment for 7 months.
Yeni bina tipi stüdyo daireler | Konut sınıfı elit |
Teslimat süresi Teslim edildi | Yüzme havuzu Mevcut |
Kat sayısı 4 | İç tamamlama işleri anahtar teslimi |
Daire sayısı 19 | Kapıcı Mevcut |
Kapalı avlu Mevcut |
Modern apart-hotel construction in Canggu, the most promising location on the Bali island. In March 2024, 19 apartments in the hotel will be ready to receive guests. The apart hotel has strong walls, air conditioning, modern bathroom and kitchen facilities, and peaceful views outside the window. It is being built as a capital building, free of the traditional Indonesian accommodation disadvantages. It will be a pleasure to stay in any weather, now or ten years from now.
Hol
6 fotoğraf
Özellikleri
3 fotoğraf
Anahtar teslimi tamamlama
$127.000–162.000
Adres: BAE, Dubai, Saih Shuaib 2, BLOCK J P176 TİCARİ, ofis No. J-00